Welcome to Psi Upsilon - Pi Chapter Thursday, August 17 2017 @ 07:35 am EDT  
Contribute |  Advanced Search |  Site Statistics |  Directory |  Pi Chapter Alumni |  My Downloads | 
Quick Links
Picture Library
Composite Library
Historical Archive
Pi Garnet Archive
Document Library
Update Mail Address
Piweb Account Request
Forgot Username?

User Functions





Lost your password?


Who's Online
Guest Users: 1


UPDATE #2: 2010 Pi Renovation Update - Southern Facade    
Sunday, November 07 2010 @ 10:53 am EST
Contributed by: Admin

General NewsWork is wrapping up on this critical renovation project. Important tasks completed to-date:

- Installation of new composite siding

- Reconstruction of the lower roof and removal of yankee gutter system.

- Extensive flashing and residing of the 3rd floor bathroom dormers.

- Completion of the new pitched dining room roof with additional overhang over existing structure.



We will need to put a coat of paint and will probably look to tackle that in the Spring when the weather is more hospitable. This will be the model that will drive the exterior renovation for the entire house.











  [ Views:: 3,685 ]  

Story Options


Printable Story Format

Trackback

Trackback URL for this entry: http://www.piwebcentral.com/trackback.php?id=20101107225317656

No trackback comments for this entry.
Created this page in 0.03 seconds


 Copyright © 2003-2012 Psi Upsilon - Pi Chapter
 All trademarks and copyrights on this page are owned by their respective owners.

Powered by